Pipeline Management
LOOP offers the management of connecting carrier facilities through full-time operatorship. The LOCAP pipeline, operated by LOOP, connects the LOOP Clovelly storage facility to St. James, Louisiana, 54 miles (87 km) to the North. The St. James terminal facility has eight breakout tanks with over 2.6 million barrels (413,000 m3) of storage capacity situated on 140 acres of land. The 48-inch (122 cm) diameter LOCAP pipeline has a throughput capacity of 1.7 million barrels (270,000 m3) per day and can expand to 2.4 million barrels (380,000 m3) per day.